Unit 1 is a detached, steel portal framed industrial unit, constructed by a combination of brick work and profile clad elevation.
The recently constructed building benefits from having a car park to the front of the site, secure yard and further parking to the rear of the building. Internally the unit benefits from a solid concrete mezzanine floor which is used as additional workshop / storage space.
The unit also benefits from having w.c.’s, shower room, uPVC double glazing, fully fitted offices at ground floor level, central heating, suspended ceiling and LED lighting.